(Are you looking for a specific room in this building? View the floorplans.)
Building C was constructed in 1977, and the area now known as 'Planet Holywood' was the church sanctuary from 1977 until the next sanctuary was constructed in 1985.
The lower level of this building is the Mt. Bethel Preschool and their office. The upper level of this building includes the our Education Ministry and 'Planet Holywood' (staff offiices).